Yachts and superyachts in the harbour of Saint-Tropez
France

Yacht Sanitization in Saint-Tropez

A summer port with a short, crowded season and almost no room to work.

Saint-Tropez is busy for a few months and quiet for the rest. Both halves matter: in season nothing complicated can be started, and out of season the yachts that stay are sitting with nobody using them.

Reached on request, Var coastPlanned around your programmeDiscreet, alongside, no yard move
The port

In season, only what finishes the same day

The berths here are tight, the quay is public and every yacht has somewhere to be.

During July and August the only sensible jobs are the ones that start and finish inside a turnaround: treating the water system, taking samples, dealing with the galley extraction. Anything else waits.

Out of season the picture flips. The yachts left here are barely used, which means standing water in most of the system and air conditioning units that run for an hour a month and then sit damp.

A boat that stays in Saint-Tropez through the winter needs the same attention as one laid up anywhere else, and often gets less of it because she is technically still afloat and in service.

Yacht fresh water lines and outlets
Certified processes
  • ISO 9001
  • ISO 14001
  • ISO 45001
  • ISO 16636
A.I.I.S.A. member · NADCA ASCS certified
Air conditioning unit in a yacht cabin
Timing

Two different jobs, six months apart

What to book depends entirely on which half of the year you are in.

In season: sampling and the quick work, timed to a turnaround, with the units on the quay for as short a time as possible.

Out of season: the full list, including the air side, while there is space and nobody waiting for the berth.

How a visit works

From the first call to the report

The sequence is the same whichever berth you are on in Saint-Tropez. What changes is the timing, and that is planned around the yacht rather than around us.

We look before we quote

A technician goes through the yacht with the crew: which outlets are used daily and which almost never, where the air handling units sit, what the crew has actually noticed.

The visit is planned around you

We fit the work into the window you have — between charters, during a yard period, or over a quiet weekend alongside.

We work alongside

No yard move and no lift. The heavy equipment stays on the quay; only hoses and a small dosing unit come aboard, on protected decks.

You get it in writing

Sampling points, what was done, and the laboratory report where water was analysed. That document is what closes the job.

Francesco Colombo, CEO of AirBio Marine (Ekonore S.r.l.)
A word from our CEO

Every port has its own rhythm. We plan the visit around the berth and the crew, not the other way round.

Francesco Colombo

CEO · AirBio Marine, a division of AirBio (Ekonore S.r.l.)

Book a survey at this port
The AirBio Marine technical team standing with the service van and equipment on the quay of a Mediterranean marina
The same technicians who come on board, with their own equipment and service van.
Our people

Our own technicians, certified processes

Every intervention is carried out by AirBio technicians employed and trained in house, never subcontracted. We work under certified management systems and close each job with a technical report the captain can file on board.

  • ISO 9001Quality
  • ISO 14001Environment
  • ISO 45001Health & safety
  • ISO 16636Pest management
What our clients say

Verified reviews on Trustpilot

Our work on board

What a visit looks like

A few moments from the jobs we do on yachts every season: the equipment on the quay, the systems we open and the checks we close with. The same way of working applies in Saint-Tropez.

Yacht sanitization intervention in progress with equipment on the pontoon, Riviera marina
Water system sanitizationOnboard intervention in a Mediterranean port.
AirBio Marine technician setting the water sanitization unit on the protected teak aft deck
Pre-season interventionComplete system preparation.
Marine fan coil unit with coil, valve and pipes visible during an AirBio Marine inspection
Fan coil cleaningDeep cleaning for optimal air quality.
Deck jacuzzi on a yacht with a digital meter measuring the water after treatment
Legionella monitoringRisk assessment and water measurements.
AirBio Marine treatment units on the quay beside a motor yacht during a fresh-water system sanitization
Units stay on the quayOnly hoses and a small dosing unit come aboard.
Nearby

Other ports on the same run

If the yacht moves before we get to you, or you are berthed one harbour along, these are the pages for the ports next door.

The complete list is on the ports page.

FAQ

Working in Saint-Tropez: frequently asked questions

Can you work here in August?

For the water system, the sampling and the galley extraction, yes, if we have a firm window. For anything involving cabins, no — there is neither the time nor the space.

The yacht stays here all winter but is still in the water. Does that count as layup?

In practice yes. If nobody is using the system, it behaves like a layup regardless of whether she is afloat, and it needs the same treatment.

How far ahead should we book for the season?

Well before June. The window in season is narrow and it fills early.

Onboard survey

In Saint-Tropez?

Tell us the yacht, the dates and whether she stays through the winter. A technician calls you back within 24 hours.

Onboard survey request

Tell us about the yacht

Yacht length, marina, systems and what you have noticed on board. A technician reads the message and calls you back to plan the survey.

"*" indicates required fields

Name*

Prefer to talk?

+39 0584 433 198

Monday to Friday. For captains, engineers and managers.

Where we work

Italian Riviera and Tuscany marinas and yards — Viareggio, La Spezia, Portofino, Genoa, Sanremo, Livorno, Argentario — and other Mediterranean ports on request.

Documented work

Every job ends with a technical report and photos for the yacht's records.